The Model DIDP Duplex
Isolated Power Panel is designed for quick
and simple field installation. The back box is
installed first, during the "roughing in" phase,
allowing the contractor to mount the box as the
walls are being erected. The back box must be
located in accordance with NEC requirements.
The subpanel and front trim are installed during
the "final" construction phase.
The transformer, LIM, circuit breakers, and all
other components are preassembled on the
subpanel and wired at the factory. The contractor
needs only to mount the subpanel inside the
back box and connect the primary feeder,
branch circuits and signal conductors. Ample
space is provided for field wiring.
Field checkout, equipment certification and staff orientation by a
PG LIFELINK
factory representative is available.