The Surgical Facility Panel was designed with the electrical contractor in mind. All components are factory-mounted and wired making field installation quick and simple.
The back box can be shipped first during the "rough-in" phase allowing the contractor to set the box as the
walls are erected. The chassis and front are then shipped later during the "final" construction phase.
The chassis mounts on four studs inside the back box and the front cover fastens to the back box with a continuous piano hinge. All components are factory installed and wired with a harness. The wires in the harness are fanned out and numbered for easy field connection to the master terminal board. Connection of the primary feeder, branch circuits and ground conductors is the only other field wiring required.