How LabLink Helped a Production Lab Eliminate Floor Clutter and Improve Workflow
Situation:
A production lab was undergoing a facility refresh to improve technician movement and streamline operations. The existing layout relied on floor-mounted power poles, limiting workstation flexibility and creating physical barriers throughout the space. With a need to free up floor space and deliver power more efficiently, Gem Electrical Contracting set out to find a better solution for its utilities.
PG LifeLink Response:
With LabLink ceiling service panels in place, the lab achieved its goal: a more open, flexible layout that improved technician workflow. The overhead drops made it easier to reconfigure workstations based on evolving production needs, and power was now more accessible.
The elimination of floor-mounted utilities also created a cleaner, safer environment with less visual and physical obstruction. For the lab's team, the upgrade translated into smoother day-to-day operation and improved adaptability.
Results:
- Ceiling service panels enabled quadrant-based flexibility and smoother technician movement
- Eliminated floor-mounted power poles for a cleaner, safer workspace
- Durable panel construction allowed confident mounting without extra reinforcement
Testimonial:
The goal was to provide flexibility per quadrant of workstations for ease of flow, and LabLink delivered. The panels were very sturdy, which allowed us to secure them confidently. I would definitely recommend LabLink to any facility planning a similar lab build. - Jose Moreno President at Gem Electrical Contracting
