Your browser is out of date.

You are currently using Internet Explorer 7/8/9, which is not supported by our site. For the best experience, please use one of the latest browsers.

Need a Schneider Panel Replacement Partner You Can Count On?

PG LifeLink delivers retrofits, LIM replacements, and service with unmatched speed and support.

Get a Replacement Quote

Service Highlight: Your Guide to NFPA-Compliant Annual LIM Testing

If you manage a healthcare facility with operating rooms or critical care areas, you know that annual testing of Line Isolation Monitors isn't just best practice - it’s required by NFPA 99 code. But understanding exactly what's involved, when to schedule testing, and how to maintain compliance can be complex. Whether you're preparing for an upcoming inspection or establishing a regular testing schedule, these frequently asked questions will help you navigate the requirements and keep your isolated power systems operating safely.

Do Your Panels Need Testing?

PG LifeLink provides annual testing services to hundreds of facilities across the country, with convenient evening and weekend service scheduling.

View a Sample Report Schedule a Test

Frequently Asked Questions

What happens during an annual LIM test?

During annual testing, our certified technicians verify that your Line Isolation Monitor is functioning properly, test the alarm systems, check a random sample of receptacles/equipment for proper grounding, and ensure compliance with current NFPA standards. You'll receive a detailed report and certification documentation 10 business days upon completion.

How often should Isolated Power Panels be tested?

NFPA 99 Code requires all Line Isolation Monitors (LIMs) to be tested and documented at least once every 12 months (every month for older, analog designs). 

"6.3.4.1.4  The LIM circuit shall be tested at intervals of not more than 1 month by actuating the LIM test switch. For a LIM circuit with automated self-test and self-calibration capabilities, this test shall be performed at intervals of not more than 12 months. Actuation of the test switch shall activate both visual and audible alarm indicators." - NFPA 99 - 2012 

 

NFPA 99 Code also requires that LIMs are tested after any "repair or renovation" to the system using external fault loads. 

"6.3.4.1.5  After any repair or renovation to an electrical distribution system, the LIM circuit shall be tested in accordance with 6.3.3.3.2." - NFPA 99 - 2012

"6.3.3.3.2  Line Isolation Monitor Tests.  The line isolation monitor (LIM) circuit shall be tested after installation, and prior to being placed in service, by successively grounding each line of the energized distribution system through a resistor whose value is 200 x V (ohms, where V equals measured line voltage.) The visual and audible alarms (see 6.3.2.6.3.2) shall be activated." - NFPA 99 - 2012

Isolated Power Panel Testing Requirements

Do you provide service in my area?

PG LifeLink has the industry’s largest network of factory-certified technicians. We service facilities from coast to coast, including remote locations. Contact us with your facility name/address and confirm the quantity of LIMs at your facility, and we can get you connected with our service team.

How quickly can you schedule an annual test?

We understand that many facilities need urgent testing, especially when facing inspections or compliance deadlines. We typically can schedule testing within 1-2 weeks, and we offer expedited service for emergency situations. For operating rooms, we can arrange after-hours or weekend testing to minimize disruption.

Can you test panels from other manufacturers?

Yes, we can test and certify isolated power panels from various manufacturers, including Square D, Schneider, and Bender systems. Our technicians are trained on multiple brands and can ensure your panels meet NFPA requirements regardless of the manufacturer.

What if my panel fails the annual test?

If your panel fails testing, our technician will provide a detailed report of the issue found. Once the necessary information is collected by our technician, our service team can provide quotes for necessary retrofits or replacements. We support upgrades for isolated power systems of any brand or vintage, including obsolete panels installed as far back as the mid 1970s, modernizing them with digital soultions such as our SafeDetec LIM.

If we add a receptacle to an existing isolated power system, does the entire system need to be retested?

According to NFPA 99 Section 6.3.4.1.5, modifications to an isolated power system typically require testing to verify that the system still meets safety standards. Contact us to discuss your specific modification, and we can advise on the testing requirements.

How far in advance should we schedule our annual test?

We recommend scheduling your annual test 30-60 days before your certification expires. This allows time for any necessary repairs or follow-up work if issues are discovered during testing. Many facilities schedule their testing during the same month each year for consistency.

Schedule Annual Testing with PG LifeLink

Stay ahead of compliance requirements and protect your patients with professional annual LIM testing from PG LifeLink. Our certified technicians service facilities nationwide, providing thorough testing, detailed reporting, and expert support for all major panel manufacturers. Don't risk non-compliance or system failures. Contact PG LifeLink to schedule annual testing today.

Contact Us